Telangana Irrigation Minister Blames BRS Misgovernance and Project Delays for State's Drought Distress
Telangana's government has attributed the current agricultural drought distress to severe delays and infrastructural failures in key irrigation projects during the previous BRS administration.

Addressing the media and review meetings on the state's water security, the state irrigation leadership highlighted that extensive delays, design compromises, and budgetary overruns during the past decade left agricultural tail-end lands deprived of water during critical harvesting and sowing phases.
Unfinished Canals and Structural Vulnerabilities
State officials noted that while grand flagship initiatives were heavily promoted under the earlier administration, foundational canal networks and distributaries remained incomplete. Consequently, several agrarian districts in central and southern Telangana are now grappling with declining groundwater tables and parched reservoirs.
Particular scrutiny was directed toward the flagship Kaleshwaram Lift Irrigation Scheme (KLIS), where recent structural concerns and settling of piers at the Medigadda barrage severely curtailed pumping operations during the dry season. The disruption left reservoirs downstream operating far below designed capacity, preventing planned releases into minor irrigation tanks and local ayacuts.
Key issues raised by irrigation authorities include:
* Incomplete Distributary Networks: Major barrages were constructed without finishing the last-mile distribution canals necessary to feed farming plots directly. * Postponed Lift Irrigation Schemes: Long-standing lift irrigation projects designed for drought-prone regions remained stalled or underwent repeated realignment, deferring their benefits. * Operational Bottlenecks: Structural integrity assessments following engineering lapses have restricted seasonal water storage and redistribution.
Agrarian Impact Across Districts
The lack of canal-fed irrigation has compounded the seasonal shortfall in rainfall, triggering acute stress among paddy, cotton, and maize cultivators. In several mandals, borewells have dried up, forcing cultivators to purchase water at exorbitant rates or abandon standing crops.
Farmer associations across several districts have appealed for emergency power supply to sustain functional pump sets, along with targeted financial relief to offset yield losses incurred during this harvest cycle.
Government Outlines Remedial Measures
In response to the escalating crisis, the current administration has directed the Irrigation Department to deploy contingency measures. District collectors have been instructed to prioritize drinking water allocations while identifying alternative supply channels to safeguard standing crops wherever technically feasible.
An expert engineering assessment is also underway to fast-track pending canal works and rectify structural flaws across key barrages, aiming to stabilize the state's irrigation grid ahead of the upcoming monsoon cycle.
Opposition leaders from the BRS have pushed back against the allegations, arguing that current water shortages stem from inadequate seasonal planning and delayed maintenance by the incumbent administration rather than past infrastructural execution.
About Gaurav Sen
Senior Editorial Director & Lead Geopolitical Analyst
Senior Editorial Director and investigative correspondent covering national affairs, international relations, defense, and economic policy for Live News 365.


